Micron's Singapore HBM Advanced Packaging Facility Welcomes First Tool, First Output Expected in Early 2027
IT之家, November 20 — On November 19 local time, Micron's high-bandwidth memory (HBM) advanced packaging facility in Singapore held a first-tool move-in ceremony, celebrating the installation of the first piece of manufacturing equipment into the site's cleanroom.

陈国兴, Senior Vice President of Global Packaging and Test at Micron Technology, said construction of the HBM advanced packaging facility is progressing smoothly, with first output expected in early 2027.
In January 2025, Micron broke ground on the Singapore HBM advanced packaging facility, with total investment of about $7 billion (IT之家 note: roughly RMB 46.844 billion at current exchange rates), and the related investment will continue beyond 2030.
In January 2026, Micron broke ground on an advanced wafer fabrication facility, which officials said will become an indispensable part of its NAND Center of Excellence, with wafer output expected in the second half of 2028.
The HBM advanced packaging facility is expected to create about 1,400 jobs initially. Together with the advanced wafer fabrication facility, total new jobs will reach about 3,000.
Related Articles
- Amkor plans to spend 3 trillion won over the next 5 years to expand advanced packaging capacity in Gwangju, South Korea
- China's first 3D advanced packaging volume production line goes online in Wuhan Optics Valley
- Demand surging; TSMC reportedly plans to add 5 advanced packaging plants
- Amkor announces phase two of its Arizona advanced packaging and testing campus, with cumulative investment of $12 billion across both phases
- Innolux unveils Chip Last FOPLP advanced packaging platform, with mass production expected in 2027H2
- 先封 introduces the country's first glass-substrate CoPoS sample for AI computing chips, developed jointly with 燧原