Newshot

Show HN: OpenButterfly – Tracking the environmental impact of the AI ecosystem

Original text(via HN AI)

Sites by status

StatusSitesCapacity
Operational15822.3 GW
Halted240 MW
Under construction2817.4 GW
Announced223.8 GW
Cancelled7n/a
Total21743.6 GW

Capacity is the full planned size of each site where reported or estimated; 144 of 217 sites have a figure, taken from company statements, permits or our estimates. Cancelled sites are listed but not counted in capacity. Coverage in China and Russia is less complete than elsewhere: operators there publish few site-level figures, so many sites have no capacity figure. Each site lists its sources and a confidence rating. See the methodology for how sites are selected.

Loading map…

Largest sites

The ten largest sites by planned full capacity. Bar color shows status; most of this capacity is not yet built.

  • Meta Hyperion (Richland Parish, Louisiana)5.0 GWMeta Platforms Inc. · Under construction · Richland Parish, Louisiana, US

Meta Platforms Inc. · Under construction · Richland Parish, Louisiana, US

  • AWS Project Rainier (New Carlisle, Indiana)2.2 GWAmazon Web Services (Amazon.com Inc.) · Operational · Northern Indiana, US

Amazon Web Services (Amazon.com Inc.) · Operational · Northern Indiana, US

  • OpenAI Stargate Project Jupiter (Santa Teresa, Doña Ana County, New Mexico)2.2 GWOpenAI Inc. · Under construction · Doña Ana County, New Mexico, US

OpenAI Inc. · Under construction · Doña Ana County, New Mexico, US

  • OpenAI Stargate Shackelford County / Frontier (Shackelford County, Texas)1.4 GWOpenAI Inc. · Under construction · Texas, US

OpenAI Inc. · Under construction · Texas, US

  • OpenAI / Oracle Stargate I (Abilene, Texas)1.2 GWOpenAI Inc. · Operational · Texas, US

OpenAI Inc. · Operational · Texas, US

  • OpenAI Stargate Milam County (Cameron, Milam County, Texas)1.2 GWOpenAI Inc. · Under construction · Texas, US

OpenAI Inc. · Under construction · Texas, US

  • Google / Adani AI Data Center Campus, Visakhapatnam1.0 GWGoogle (Alphabet Inc.) · Under construction · Andhra Pradesh, India

Google (Alphabet Inc.) · Under construction · Andhra Pradesh, India

  • Meta El Paso AI Data Center (El Paso, Texas)1.0 GWMeta Platforms Inc. · Under construction · Texas, US

Meta Platforms Inc. · Under construction · Texas, US

  • Meta Lebanon AI Data Center Campus (Lebanon, Indiana)1.0 GWMeta Platforms Inc. · Under construction · Central Indiana, US

Meta Platforms Inc. · Under construction · Central Indiana, US

  • Meta Prometheus AI Cluster (New Albany, Ohio)1.0 GWMeta Platforms Inc. · Under construction · Central Ohio, US

Meta Platforms Inc. · Under construction · Central Ohio, US

Sites in water-stressed basins

68 of 217 sites, about 6.4 GW of capacity, are in basins that WRI Aqueduct rates high or extremely high for baseline water stress.

  • OpenAI / Oracle Stargate I (Abilene, Texas)Texas, US · OperationalHigh1,200 MW

Texas, US · Operational

  • Google / Adani AI Data Center Campus, VisakhapatnamAndhra Pradesh, India · Under constructionHigh1,000 MW

Andhra Pradesh, India · Under construction

  • Meta / Sify Technologies AI Data Center, VisakhapatnamAndhra Pradesh, India · AnnouncedHigh500 MW

Andhra Pradesh, India · Announced

  • Meta Eagle Mountain AI Data Center CampusUtah, US · OperationalHigh400 MW

Utah, US · Operational

  • Microsoft Azure Phoenix Campus (Goodyear)Maricopa County, Arizona, US · OperationalHigh300 MW

Maricopa County, Arizona, US · Operational

  • Google Henderson Data Center CampusSouthern Nevada, US · OperationalExtremely high250 MW

Southern Nevada, US · Operational

  • Microsoft / Nscale AI Data Center Campus (Sines, Portugal)Sines, Alentejo Litoral, Portugal · OperationalHigh200 MW

Sines, Alentejo Litoral, Portugal · Operational

  • Microsoft AI Cloud Region Abu DhabiAbu Dhabi, UAE · OperationalExtremely high200 MW

Abu Dhabi, UAE · Operational

Largest eight by capacity shown. Water stress is researcher-assigned per site from WRI Aqueduct 4.0; it describes the basin, not the facility's own draw.

Classification

Environmental data

Water stress, grid carbon intensity and drought risk are assigned from published sources (WRI Aqueduct, EPA eGRID, IEA, China MEE, Ember). Each value shows its source and confidence tier.

What we do not claim

We do not attribute environmental harm to specific facilities. Community concern flags record events reported in public sources. They do not imply causation. See the methodology for full definitions.

The text above was extracted automatically from the source page and may miss images, tables or code blocks. The original is authoritative.

Published by HN AI
This site only summarises and aggregates; copyright stays with the original author. Headlines and summaries follow the source — where they differ, the original wins.
Read the original ↗