Newshot

Samsung Electronics breaks ground on new HBM production line at Onyang site in South Korea, total investment 46 trillion won

AI summary

Samsung Electronics held a groundbreaking ceremony on November 12 for a new production line at its Onyang site in Asan, South Chungcheong Province, with South Korean President Lee Jae-myung attending and speaking. The new line is an HBM back-end advanced packaging facility with 5 production lines, representing a total investment of 46 trillion won, including 6 trillion won for the building and 40 trillion won for equipment. The new plant will be a three-story production facility with total cleanroom area of 31,000 square meters, with production planned for 2028, raising the Onyang site's total floor area from 270,000 to 420,000 square meters.

Translation(model translation, not the source's own text)

Samsung Electronics Breaks Ground on New HBM Production Line at Onyang Complex in South Korea, Total Investment of 46 Trillion KRW

IT Home, November 12 news: Today, local time in South Korea, a groundbreaking ceremony for the Chungcheong region "super project" was held at the construction site of the new production line at Samsung Electronics' Onyang complex in Asan, South Chungcheong Province. South Korean President Lee Jae-myung attended and delivered a speech.

The new production line under construction at Samsung Electronics' Onyang complex is an HBM back-end advanced packaging facility, comprising 5 production lines, with a total project investment of 46 trillion KRW (IT Home note: approximately 229.54 billion RMB at current exchange rates), including 6 trillion KRW in facility investment and 40 trillion KRW in equipment investment.

The new plant, whose construction starts today, will be built as a three-story-above-ground production facility with a total cleanroom area of 31,000 square meters. The project is scheduled to begin production in 2028, and the total floor area of Samsung Electronics' Onyang complex will increase from the previous 270,000 square meters to 420,000 square meters.

Related Articles

  • Nearly double year-on-year: Samsung Electronics' cash assets reportedly exceed 200 trillion KRW, the first for a Korean company
  • Samsung Electronics reportedly plans to produce HBM base dies for AMD and other customers at its second Taylor wafer fab in the US
  • Samsung plans to shut down all 8-inch wafer foundry production lines by the end of 2030
  • Samsung Electronics: HBM capacity sold out for 2027, overall memory supply expected to remain tight through 2028
  • Samsung Electronics' MX and NW businesses post losses again in 2026Q3, memory revenue up 16.5% quarter-on-quarter
  • Samsung Electronics' FY2026 third-quarter results surge: net profit attributable to shareholders 75.21 trillion KRW, up 526.39% year-on-year

The translation is machine-generated and individual terms may be off. Nothing is rewritten or cut; the original is authoritative.

Published by IT之家
This site only summarises and aggregates; copyright stays with the original author. Headlines and summaries follow the source — where they differ, the original wins.
Read the original ↗